Plan the radio path
Azulogic describes up to 10 km line-of-sight node range. This is a communication specification; it is not a 10 km fire-sensing radius. Trees, terrain, installation height and interference affect the radio path.
Connect measurements to the platform
The gateway brings data from distributed nodes into the monitoring workflow. Assess local connectivity and backhaul availability as part of the deployment design.
Survey before scaling
Map the monitoring area, test representative radio paths and check the practical installation locations. A site survey helps identify gaps before full rollout.
Define operational ownership
Agree who monitors connectivity, investigates missing data and maintains infrastructure. Network health and fire alerts need clear, separate response procedures.
Move from questions to a deployment plan
Tell us about the area and assets you want to protect. We can discuss the monitoring approach and a practical next step.
Request a consultation