Scope and ownership
Define the monitored area, priority assets, timeline and project owner. Agree what the pilot can establish and which questions require longer seasonal observation.
Installation and connectivity
Review land access, permissions, mounting locations, terrain and communication paths. Document the installed coordinates and confirm each node reports as expected.
Data and evaluation
Agree criteria for data completeness, network availability, environmental baselines and notification latency. Record the circumstances of alerts and define how false alarms and missed events will be assessed.
Operational exercise
Confirm recipients and escalation paths. Run a notification exercise without presenting it as a real emergency. Document acknowledgement and the team's verification process.
Decision and next steps
Review performance against the agreed criteria, record limitations and estimate the effort needed for a larger deployment. Retain the results so future phases can be compared.
From measurements to a response
- 1. Sensor nodes
Environmental measurements and site coordinates provide context for an emerging anomaly.
- 2. Gateway and network
Radio links carry observations to the monitoring platform. Check connectivity separately from detection coverage.
- 3. Platform and response team
Review the location and trends, route the notification and follow the agreed verification procedure.
What to record during a pilot
Agree acceptance criteria before installation. This evaluation framework describes what to measure; it does not present completed field-test results.
| Measure | Evidence to retain |
|---|---|
| Data completeness | Expected and received reports, missing intervals and outage causes. |
| Radio connectivity | Node coordinates, gateway location, terrain and link observations. |
| Alert delivery | Generation, delivery and acknowledgement timestamps for an agreed test notification. |
| Detection evaluation | Defined event conditions, reference observations, false alerts and missed events. |
| Operational readiness | Responsible recipients, escalation contacts, verification steps and exercise findings. |
Move from questions to a deployment plan
Tell us the site location, approximate area, priority assets and connectivity constraints. We can discuss a site assessment and pilot evaluation criteria.
Discuss a wildfire detection pilot